Production process of wire harness factory: blanking, first sub-assembly (pre-assembly), crimping, assembly, final assembly, external inspection, electrical inspection.
1. Blanking
Blanking is to cut and peel the original line (usually a coil line and a barrel line) according to the process requirements.
When unloading at the unloading, it should be noted that its deviation is generally adjusted to about +10, and there can be no negative deviation. In the case of unloading, if there is an unstable situation, it should be debugged or repaired in time. The unloader generally has a fan for heat exhaust, if the discharge temperature is abnormally high, the machine should be turned off and inspected.
The tools of the unloading machine should be replaced in time after long-term use and wear. When unloading, the label should be affixed, and the handwriting on the label should be neat and clear, and the content of the label includes the product model used, the length of the original wire, the stripping length at both ends and other information. The finished material should be placed according to the position specified in the original line area.
2. First dispensing (pre-installation)
The first dispensing is prepared for crimping and usually includes the following processes: threading the silicone tube, wearing the pull-back connector, and stripping the waterproof plug and the three-core two-core wire.
Some relatively large terminals, if you need to pass through a small silicone tube (such as a silicone tube with a diameter of Φ6), you must first wear the silicone tube at the sub-assembly, and then crimp the terminal, so as not to cause the silicone tube to be too large to pull.
Pull-back terminals, such as 1216, 2190 and some other connectors, must first thread the wire into the connector, and then wait for the terminal to be pressed.
In this regard, the dispensing process should be particularly careful, requiring technicians to have a good understanding of the connector and terminal.
Special attention should be paid to the fact that if the process requires the three-core wire to be cut or fully wound with PVC, it must be operated in accordance with the process, because some three-core wire insulation skin is made of conductive materials, if not cut or not protected, it will easily lead to leakage or fire, and the consequences are very serious.
3. Crimping
Crimping is a way to use mechanical equipment such as crimping machines to press terminals and raw wires together so that they can play a connecting role.
When crimping the general terminal, we should pay attention to the following points: Before the tooling personnel debug the mold, it must not be operated at will. When crimping, we must first test the tensile force and the height of the terminals. In this way, we can use the measured actual tensile force value and height value as a standard for whether the product meets the requirements.
If there are other abnormal factors such as terminal jamming jaws during the crimping process, the power supply of the motor should be cut off immediately, and then the relevant person in charge should be informed in time. When crimping, avoid turning heads and ears, concentrate your thoughts and work carefully. After the crimping is completed, be sure to cut off the power supply to avoid unnecessary work accidents.
Equipment engineers should check whether there is any damage in the process of changing the mold, and if there is damage to the crimping jaws, they should be replaced in time. Usually be sure to protect the mold, clean up the chip accumulation in time, regularly oil and check and debug, if there is a problem with a mold, you should do a comprehensive inspection.
After the crimping process is completed, some terminals require heat shrinkage. Heat shrink is the practice of placing a heat shrink tube on a bare wire or terminal and baking evenly on an air gun until it wraps the terminal or exposed wire.
Heat shrinkable tube can be divided into single layer and double layer two, single layer heat shrinkable tube is mainly used on the iron, and double layer is generally used on the riveting point, their role is the same - to protect and prevent leakage.
In the baking process of the heat shrinkable tube, attention should be paid to constantly flipping the baking, the line body and the surface of the heat shrinkable tube can not have carbonization phenomenon, if it is a double-layer heat shrinkable tube, the liquid flowing out of the heat shrinkable tube should fully and evenly wrap the line body.
Sometimes there will be bending and deformation at the end during the baking process, which is not possible in principle, but it is difficult to avoid in actual operation, so as long as it does not affect the use, the bending is not too serious.
4. Assembly
It is the process of arranging, wiring, winding, wrapping, and finally obtaining the finished product according to the position and line specified in the board.
It is best to print the assembled board on photo paper. The board drawing should include the following: the length of each paragraph; the size, length and position of bellows and silicone tubes; The position of each connector and the wire number, specification, color, hole position of the wire on the connector, etc.; the strike distribution of the line; nut positioning holes; Precautions and their special technical notes, etc.
The operator should assemble and assemble in strict accordance with the provisions of the board during the operation, and should raise the problem to the technical staff in time. If you encounter accidentally inserting the terminal incorrectly or other special circumstances during the operation, you should notify the relevant person in charge as soon as possible to solve it.
When plugging in the terminal, it should be in accordance with the following requirements: one plug, two listening, three pulling.
Some terminals will have positive and negative differences when inserting, so when encountering difficulties in insertion, you should adjust the insertion direction of the terminal in time, and do not press hard.
A slight "pop" sound will be heard after normal insertion. When you hear the sound, don't push hard, but pull back to see if there are any loose marks.
If the terminal cannot be inserted in any direction it turns, it may be that the terminal is pressed incorrectly, or the connector is delivered incorrectly, and the technician should be notified as soon as possible for a detailed check to determine its rectification plan.
5. Final assembly
Final assembly is a process immediately following assembly, including the large bellows on the upper trunk, the winding of the main trunk and some small bellows, etc. The most important thing in this step is to coordinate the division of labor in the middle with the assembly, because it is difficult to make a clear boundary between the bellows and who will operate it, and the bellows on the trunk or the bellows with a diameter of more than Φ13 can be considered for final assembly to complete.
6. External inspection
The work of external inspection is to check whether the size, appearance, etc. of the product are qualified. The requirements of external inspection are as follows: First, there can only be positive deviation in size, and there can be no negative deviation, that is, only long can not be short, short will appear when installing the machine can not be pulled, and the longest can not exceed 10mm. Second, the wire exposed outside the bellows or silicone tube cannot exceed 5mm.
Third, there can be no excessive "burst line" (the bellows cannot wrap the line body). Fourth, whether the terminal is obviously not in place. In practice, it is not necessary to measure every product with a tape measure. We only need to measure an accurate one, and then use this as a reference sample, and each subsequent one is compared with this one side by side, and if there is no obvious difference in length, it is qualified.
7. Electrical inspection
Electrical inspection is to test whether its circuit is smooth with the help of some electronic testing instruments and equipment. Electrical inspection equipment may vary from manufacturer to manufacturer. Almost all of today's inspection equipment has been supplemented by computers, which not only makes programming convenient, but also speeds up the efficiency of inspection.